Continuing the theme from last night’s posting…the photos here show more of the results of last week’s flurry of activity at the “L” Shaped House. The first photo shows the dryer in the first floor laundry room after Paul finished hooking up the newly routed venting that allows a closer fit to the back wall.
The next photo shows the tall upper cabinet above the washing machine in the first floor laundry room after Paul cut a hole through the ceiling to connect to the laundry chute above. The third photo shows the basement microwave cabinet after Luke (Wire-Rite) finished installing the electrical outlet in the cabinet above and routing the power cord to the microwave.
the fourth photo shows the stacked washer and dryer in the second floor laundry room with nearly every detail completed including paint touch-ups, window hardware, and plumbing hook-ups.
The fifth photo shows the first floor bathroom after Luke (Wire-Rite) finished wiring the light fixture…Pete (Carmichael Decorating) repainted the wall…and Paul mounted the mirror Deb selected. Paul and Nate also removed, re-scribed, and re-mounted the cultured marble vanity top to get a better fit along the back wall.
The sixth photo shows the lockers Paul is building in the mudroom. He has all of the maple trim attached and is just about ready to start sanding and filling. The 18” high upper cubbies and 8” deep hanging wire baskets underneath the lockers should give us plenty of storage for our day-to-day clothing accessories.
The seventh photo shows the French doors and side lights leading to the screen porch from the living room after Paul removed the plastic film protecting the glass. The view through this “wall of glass” at the front of the living room is fantastic and it feels like the amount of light streaming in has increased ten times.
The eighth photo shows the master bathroom after Pete (Carmichael Decorating) finished touching up all of the little “imperfections” he could find (there are still a couple pieces of masking tape on the wall). He has worked the last few days touching up “here and there” throughout the “L” Shaped House.
The ninth photo shows the collection of paint in the basement storage room Pete has to sort through as he works his way around the house touching up walls, trim, and ceilings. It kind of makes you wonder what we are going to do with all these cans of paint after they leave…
The last photo shows the mechanical room in the basement with…I’m pretty sure…all of of our plumbing and mechanical systems in place. Jeremy (Steinkraus Plumbing) finished up all of the “loose ends” on the plumbing system including the drain for the water softener early in the week and Gordie Buhrer showed up Friday to plug it in and set up a program for softening.