Saturday, September 11, 2010

The Garage…Loose ends

Paul Winters has spent the last few days working to finish a couple loose ends in the garage at the “L” Shaped House before our final…final…inspection. The first photo below shows the steel I-beam post between the third and fourth stalls in the garage after he finished wrapping it in sheetrock to satisfy the fire code.

Garage 28

The second photo shows the temporary stairs leading to the mudroom from the garage as Paul works to re-configure them to meet the building code requirements. We plan to add a wheel chair lift to the left hand side of the the staircase which might eventually involve replacing the entire stair case assembly. In the mean time we plan to make a set of ramps that will attach to the stairs when we need to provide easy access into the “L” Shaped House.

Garage 29

0 comments: