At noon all of the rooms on the first and second floor were rough framed (I’m sure there are still details to attend to). The first two photos below show the hallway extending from the stairs to the upstairs laundry room at the East end of the house. Anna’s room and the attic space next to it show in the left hand photo. The right hand photo shows the book nook, the top of the stairs and the hallway. The whole second floor feels “cozy” to me.
The next photo shows Sam’s room, the hall, and bonus room. With the big window on the East wall his bedroom feels a little like a tree house. I’m sure he is going to enjoy the easy access to the wide open space that is the bonus room!
One last photo showing the front of the “L” Shaped House with the roof sheathing exposed. The roofers start shingling tomorrow morning!
Deb and I stopped by tonight to walk through the second floor. We ran into Paul and Matt Sletten as they finished laying out the footings for the front porch, Amy from next door popped over and we all toured through the house. The framing has made it difficult to get a decent photo but its fun to finally walk in and out of all the rooms.
The last photo shows the arch installed in the entry to the book nook at the top of the stairs. Oh…and Anna also ran into her friend Chester and showed him all around the “L” Shaped House!
0 comments:
Post a Comment