Matt Sletten is busy wrapping up the last bits of the ceramic tile installation at the “L” Shaped House. The first photo shows the mudroom wall tile with the bull-nose border installed all the way around the top. All that is left to do in the mudroom is install the dog door and grout the tile.
The next photo shows the basement fireplace as Matt prepares to install the 3” square accent tile border around the opening. Deb and Kim picked this tile a while back after our original choice was discontinued. We plan to have Matt get the tile in place before we finalize the outside edge detail.