Electrical…Day 17 (wrap up)

Luke (Wire-Rite) and Paul worked late Friday evening  finishing up some of the electrical work at the “L” Shaped House. The first photo below shows the Faber vent hood above the cooktop after Paul moved it down 3” and Luke re-connected the power. Once the special order 12” fixtures arrive Luke will finish up the under-cabinet lighting and the kitchen will be almost complete!

The next photo shows the air-conditioning condenser on the upper patio after Luke finished installing the electrical enclosure and wiring. It looks like cool air inside is just around the corner!

The last photo shows the front side of the Luxaire furnace and central air-conditioner in the basement mechanical room after Luke finished connecting it to the electrical system.