Jay and his crew started working on the sidewalk that will connect the driveway to the front porch this afternoon. We have decided to put a single step in the paver surface near the driveway entrance to help deal with the 11” rise required between the paver driveway and the base of the stairs to the porch. The 6’ wide walkway will lead to a 5’ wide stairway on the end of the deck. The photo here shows the step installed in the walkway and the crushed limestone base nearly ready for pavers.
Tuesday, July 13, 2010
Landscaping…Day 39 (evening report)
Posted by The Arneson Family at 8:00 PM
Labels: Driveway, Landscaping
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment