Keith (?) from Solid Construction is out this morning making adjustments as he works to fine tune the doors in the “L” Shaped House. In the first photo below he is installing the by-pass door guide on the floor in one of Anna’s closets. He had made his way through the first floor and was about half way across the second as I arrived around noon.
The next photo shows the door to Anna's room from the hallway with the door hinges aligned and all the hardware attached. The last photo shows the closet wall in Helen’s room with all the doors and hardware installed. It’s amazing how much better the place “feels” with nice working doors!
0 comments:
Post a Comment