Wednesday, August 25, 2010

Painting…Day 68

The Carmichael Decorating crew was at the “L” Shaped House in force today working on the porches and doors. The first photo below shows the front porch after they finished priming all the cedar framing and railing elements. They plan to be back tomorrow morning to put a finish coat of white stain on everything.

deck 68

The next photo shows the back breezeway porch with a coat of primer on all cedar railings. The white powder coated aluminum spindles for the railings will be installed as assembled panels later.

deck 66

The last photo shows side breezeway entrance with decorative lattice and most of the railings installed. The Solid Construction guys plan to have these stairs finished by tomorrow night.

deck 67

0 comments: