Landon is back today working on railings for all three porches at the “L” Shaped House. The first photo shows the back breezeway porch after he finished installing all of the balusters in the the railings. Once the painters finish putting the second coat on everything this porch will be done!
The next photo shows the side breezeway porch with all of the elements of the railing system in place. Landon was heading off to start on the front porch as I left around 1 pm and expects to be moving on to the screen for the screen porch sometime tomorrow.