Accessibility Lift…Design Process

The design for wheelchair lift in the “L” Shaped House is the result of a carefully considered engineering effort. The first phase of this effort was an extensive search for a commercially available lift. I think it is almost always better to buy than build when you are looking for an item like this. The commercial builders (presumably) have the advantage of having gone through many design iterations and their products generally represent the culmination of this process. We found many examples of lift assemblies available in the marketplace. Ranging from manually actuated portable lifts all the way to elaborate built-in elevators. Unfortunately none of the commercial lifts we found would fit in the space we have available. The collage below shows some of the lifts we considered in the search. The Liftboy lifting platform from Powerlift (upper left) comes as close to meeting our requirements as any of them…but in the end all are either too big or don’t lift high enough.

Commercial Lifts

The two lifts in the image below highlight the difficulty we faced while searching for a commercial lift to fit in the space available at the end of the stairs in the garage. Lifts generally fell into two categories; they were too wide or too long. It is also surprising how expensive these sorts of lifts are (nearly $6,000 for the blue one).

lift dimensions

While searching we came across a few examples of homemade lifts. A Canadian gentleman built the lift shown below (I can’t find his link again). The very clever cantilevered design addresses many of the space considerations we face in our home. It is especially interesting because the platform could be lifted quite high without requiring a large footprint. We spent some time playing around with this compelling configuration. His implementation is kind of crude…he does not use any bearings in the vertical slide. The sketch shows some possible improvements to the slide assembly but this design (compelling as it is) has a few disadvantages related actuating and controlling the lifting platform. That is…the overhead structure supporting the pulleys and cables gets tall and implementing a safe and simple control would be a little challenging (his is just a momentary switch). Furthermore I’ve found it challenging to get motor driven cable systems to operate smoothly. We considered the possibility of using a garage door actuator but could not find a small enough version anywhere.

Cantilever Concept (arrows)

Given our reservations related to controls for our lifting mechanism we expanded our search to include some other kinds of lifts. A number manufactures build lift assemblies that incorporate linear actuators in their designs. The linear actuators used generally include all sorts of nice control features like built in limit switches and “soft start” motors. Examples of these include the many different versions of lifts used to transport electric scooters for the disabled.  Unfortunately no one makes a lift rated for wheelchairs that lifts 48”. The image below shows two examples of these sorts of lifts. The Burr Handi-Lift is an interesting example that lifts to higher heights but they specifically exclude wheelchairs.

Scooter lifts

Our search turned up a fascinating possibility in the form of a personal watercraft dock lift. Several manufactures produce these lifts with both manual and electric actuators and integrated control systems. As interesting as this seems…this kind of lift has some disadvantages. The cantilevered platform has to be pretty robust (think tall) to accommodate the load and therefore ends up sitting something like 6” off the floor in the lowered position.

Boat Lift Concept

The simplicity and (relative) low cost of the mid-rise lift I purchased from Greg Smith Equipment for the third stall in the garage compelled us to look closely at this design. These kinds of hydraulically actuated scissors lifts are very common in industrial applications. The Atlas TD6MR has more than 48” of stroke and is capable lifting 6,000 pounds. Furthermore the hydraulic control system is quiet, smooth, safe, and runs off a single 120 volt outlet.

Atlas Scissors Lift

A scaled drawing of a scissors lifting mechanism tailored to the space available clearly shows that a single set of lifting arms results in a mechanism that would be unstable in the fully raised position. I produced the sketch below to inform Dan Oss and Byron Knapp (PICo’s engineering team) as we asked some questions about the structural elements of the lift mechanism. I was specifically interested in understanding the effects of lengthening one of the lifting bars.

Scissors 2

Dan quickly produced the CAD model shown here that shows how this structure works. The unequal length arms cause the platform to rotate slightly as the lift is raised. Carefully placing pivot points in the structure results in a platform that is tilted slightly forward at the bottom and slightly backward at the top of the travel. Even with this one extended lifting arm the structure looks a little unstable at the top of its travel.

Scissors concept 1 (highlight)

Working with this model quickly exposed the advantages of a “compound” scissors arrangement. In this configuration two sets of connected lifting bars push the platform to the same height while maintaining a comfortable (stable) spread even at the top of the travel. The lower sketch shows a possible motorized lifting configuration that allows the bars to clear one another as the platform is raised.

Compound Scissors Concept

As Dan’s experiments with the structure continued another possibility emerged. This time pairs of lifting arms tied together at their centers rotate and slide along a connecting rod as the stage is raised. This arrangement is superior to the previous in that the lifting bars are really quite short in relation to the stroke of the lift. It also provides for an uncluttered area between the bars for a possible actuator.

Compound Scissors Concept 2

The next sketch shows the real breakthrough in this process. Dan quickly discovered that combining a single full length lifting bar with two half length bars allowed for a structure that not only has fewer parts but also provided more flexibility for actuators. The sketches below show the mechanism as it quickly evolved. The first shows it with a full side panel supporting the arms while we see the greatly simplified support structure in the second.

Final Scissors Concept 2

The 3D CAD model below shows the lift assembly in its final form (the back side lifting mechanism is removed for clarity). Here we see the lifting platform fully raised with the hydraulic cylinder in place in the structure. The hydraulic actuator is positioned slightly off center on the lifting bar so that a cylinder with 14” of stroke produces 42” of  platform motion. The ends of the lifting bars are guided in linear slides and the cylinder is tucked snugly in-between. All of the elements in the structure are sized to provide a 1000 lb. lift rating which should easily accommodate our expected maximum 400 lb. requirement.

Final Scissors 2

We plan to use a hydraulic control system from Dalton Hydraulics. The MTE Hydraulic Pumping Station (250-730) is a D.C. powered system that we will connect to a deep-cycle battery with a “maintainer” charging system. The D.C. system will allow us to use the lift in the event we lose electrical power in the house. Multiple wired remotes will allow us to have push button control both on the platform and at the top and bottom of the lift.

Lift with control 2

C:\AutoManager WorkSpace\BEPLEY\M-Mteserver2,D-MTE PROD\Drawing\Working Copy\399\39901194-1.dwg Model (1)

Monday, September 26, 2011

Wheelchair Lift (modeled)

Over the weekend we straightened up in the garage and re-checked dimensions in the space where the wheelchair lift will be positioned. I also placed Dan Oss’s SolidWorks 3D model in the photograph below of the newly cleaned-up area using Photoshop. Arrows in the sketch show the lift platform movement as well as the wheelchair path. I think we are all now confident that this design is going to work nicely.

The next order of business is to “tweak” the structural elements of the lift mechanism as we decide on some important properties … like the size and shape of the rectangular steel tubing, and the thickness of the lifting bars. We might even subject the model to some simple finite element analysis.

Wheelchair Lift (in place cylinders notes)

Friday, September 23, 2011

Wheelchair lift (refined design)

One day of  review and refinements has resulted in this final(?) design for the accessibility lift in the garage at the “L” Shaped house. The first sketch shows the lift with the platform raised a little less than halfway up it’s travel.

Wheelchair Lift 10 

The second sketch shows the lift platform fully extended at the top of it’s travel. The transparent platform exposes the lifting mechanism under the far side.

Wheelchair Lift 9

The last sketch shows two hydraulic cylinders (crudely) placed in the assembly for clarity.

Wheelchair Lift (cylinders)

Wheelchair Lift

From the very beginning we have been paying close attention to accessibility issues at the “L” Shaped House. The original design of our home included a ramp from the garage to the mudroom entrance (here).  The elevation issue encountered early in the construction process forced us to change course and turn our attention toward a lift in the garage. After carefully considering many options we have decided to build our own lift mechanism designed by the world class engineering staff at Professional Instruments Co. Dan Oss, and Byron Knapp have come up with the ingenious scissors lift mechanism (that lifts the platform through center) shown in the Solid Works 3D model below. Hydraulic cylinders connected to the off-center vertical linkage (visible in the bottom two sketches) will actuate the the lift and requires only 12” of stoke to raise the platform to it’s full height of 41”.

Wheelchair Lift (arrow)

A refined view of this design showing one of the lifting cylinders in place below…

Wheelchair Lift 8

We plan to start fabricating the lift assembly shortly and hope to have it in place in the garage before the end of the year. The composite sketch below shows the lift mechanism superimposed on a photo of the end wall of the garage with some faint pen and ink additions to the design.

Wheelchair lift (components)

Tuesday, September 6, 2011

“L” Shaped Workshop…

Nearly 1 year on … We have the workshop in the garage set up and running!

The first photo below is a wide shot of the third stall with the workbench top fitted to the mid-rise scissors lift. The plan is to make this stall into a “convertible” workspace that will accommodate both auto maintenance and big wood working projects. The mid-rise lift provides a wonderful adjustable height base for the workbench. The only problem is what to do with the work surface when a car is in place?

Garage 46

The next two photos show the back wall of the third garage stall with our toolboxes, metal pegboard, and teardown bench in place. The galvanized metal pegboard from Wall-Control is absolutely great! Their product is well conceived and provides for not only tool storage and shelving … but light brackets as well. A few hours of organizing resulted in the arrangement seen here (it will probably evolve from here).

Garage 45

Garage 44

The last photo here shows our first project nearly complete. We are building three Nordic ski waxing stations to be used during the High School racing season this year.

First … the plan (Google Sketch-Up)

Waxing Station Assembly

Next … the (nearly complete) project. The adjustable height 4’ x 8’ work surface made this effort convenient and fun!

Garage 43

Friday, August 26, 2011

Jib Crane in Action…

So … I visited Rockler in Minnetonka last night and purchased a new Delta bandsaw for the garage workshop at The “L” Shaped House. The saw comes in a big cardboard box with a note stating “some assembly required”.  The photos below show how nice it is to have a (1000 lb. capacity) jib crane built right into the space. A few straps make lifting the bandsaw assembly out of the box and onto the assembled base a safe, and easy operation!

Jib Crane 4

Monday, August 22, 2011

Garage Organization

Ahh … I spent most of the weekend working in the garage at The “L” Shaped House attaching organizing equipment to the walls and ceiling. The photo below shows some of the fruits of this effort. First; both of our “big” ladders hanging from the Racor Bike and Ladder lifts installed to the ceiling in the foreground. Next; a hose reel, electrical cord reel, and an LED worklight all attached to the ceiling just to the left of the jib crane. Finally; the new galvanized pegboard system from Wall Control and a Gladiator GearLoft shelf on the West wall above the “tear-down” bench. All that is left now is the plumbing from the air compressor under the stairs to the cord reel on the ceiling.

Monday, August 15, 2011

The garage Lifts

After considering many options I finally selected, purchased, and installed lifts in the garage of The “L” Shaped House. The first photo below shows both the 4-post lift (in the fourth stall) and the portable scissors lift (in the third). Both lifts were purchased from Greg Smith Equipment. The 4-Post lift is an Atlas Garage Pro 8,000 chosen because it is (at least theoretically) possible to attach the wheels and push it out the door on to the garage apron. As you can see in the photo…it’s first occupants are our snow blowers.

Garage 36

The second lift is an Atlas Portable Scissors Lift (model TD6MR). This lift has a 6,000 lb. capacity and can be easily moved around inside the garage. The only compromise is a requirement for ramps with low clearance vehicles like the Mini. With the lifts installed and some of our tools now in place the garage at The “L” Shaped House is really taking shape!

Garage 37

Sunday, September 26, 2010

Garage…Sealing the floor

Sam and I spent the day Saturday working to get the garage floor cleaned and sealed before we move in on Tuesday. The first step was scrubbing the cement floor with a walk behind floor scrubber rented from Reddy Rents in Saint Louis Park. We then rolled out 5 gallons of concrete sealer on the fresh clean concrete surface.

Garage 34

Sam and his friend Harris moved a whole bunch of left over construction materials stored on the garage floor (ceramic tiles, fireplace stone, paint cans, carpeting, etc.) into the end of the crawl space. I have a feeling this might be the very last time we see the garage at the “L” Shaped House completely empty!

 Garage 33

Monday, September 13, 2010

Garage…Stairs

Paul Winters finished the carpentry work on the stairs leading to the mudroom from the garage early this afternoon. We plan to eventually replace these stairs with fabricated steel stairway that includes an integrated wheel chair lift. For the first couple of years I’m sure these will serve us well.

Garage 31

Saturday, September 11, 2010

Garage…New stairs

And just like that…Paul has the new steps to the mudroom in place. Anna and I found Paul working Saturday morning re-building the steps in the garage. He decided to pretty much start over rather than re-work the temporary ones the framing guys threw together last fall. In his typical fashion he has the variations in both rise and run well under 1/8”.

Next up…the railings.

Garage 30

The Garage…Loose ends

Paul Winters has spent the last few days working to finish a couple loose ends in the garage at the “L” Shaped House before our final…final…inspection. The first photo below shows the steel I-beam post between the third and fourth stalls in the garage after he finished wrapping it in sheetrock to satisfy the fire code.

Garage 28

The second photo shows the temporary stairs leading to the mudroom from the garage as Paul works to re-configure them to meet the building code requirements. We plan to add a wheel chair lift to the left hand side of the the staircase which might eventually involve replacing the entire stair case assembly. In the mean time we plan to make a set of ramps that will attach to the stairs when we need to provide easy access into the “L” Shaped House.

Garage 29

Saturday, August 28, 2010

The “L” Shaped House…Last weekend in August

The last few days have brought a flurry of activity in and around the “L” Shaped House. Most of the sub-contractors have been in and out as they finish up items on Nate and Paul’s list. I took these photos as I wandered around this morning catching up on the progress and decided to put them all in one blog posting. The first photo shows the steel I-beam post in-between the third and fourth stalls in the garage after Paul got it partially installed. The post attaches to the 8” I-beam in the ceiling and is designed to carry 25% of the weight of the back wall of the bonus room above.

Garage 26

The next photo shows the back corner of the mudroom under the new lockers after Matt Sletten finished installing and grouting the ceramic tile sanitary base. With this last bit of tile in place Matt is just about finished working at the “L” Shaped House!

Ceramic Tile 191

Speaking of Paul’s nice mudroom lockers…The third photo shows the collection Minwax stain Paul was able to produce after a couple of minutes of digging in the back end of his pickup truck. He wiped some stain on a few samples and Deb picked Golden Pecan 245 for the lockers.

The whole process seemed a little like a magic trick ;-)

 Cabinets 82

Luke (Wire-Rite) has been in and out all week working on various projects. The light fixture above the sink in the first floor bath has been uncooperative all along. The fourth photo here shows the fixture installed on the wall all ready for action.

Electrical 103

The fifth photo shows one of the cranks on the casement window above the kitchen sink. Steve Carmichael’s guys have been re-installing all of the window hardware as they finish up their work at the “L” Shaped House.

Windows 21

The sixth photo shows the pile of Deckorators aluminum balusters (spindles) and connectors for the railings on all three porches at the “L” Shaped House. Paul estimates that the Solid Construction guys will need 336 spindles to complete all three railings.

deck 75

The last photo shows the view off the front porch after I finished up mowing the front yard for the first time using our new John Deere lawn tractor. I had the sprinkler system turned off for four days before attempting to mow and it was still a little softer than I wanted but it had to be done. I dumped the clippings bag 10 times as I worked my way SLOWLY across the thick jungle of grass!

Landscaping 266

Saturday, August 7, 2010

The “L” Shaped House…weekend report

The “L” Shaped House saw a lot of change over the last week. While going through the photos I came across a couple of projects that merited publishing. The first photo is an extreme panoramic taken in the mechanical room after everyone (plumbers, HVAC, electricians, and home automation) finished up projects this week. The nice neat work everyone has done contributes to the “organized” feeling in the room.

The second photo shows the last stall in the garage after Luke installed the first two fluorescent light fixtures in the ceiling. We plan to make a couple of “tweaks” to the fixtures before he moves into the remaining stalls but the placement and “amount” of light will stay the same.

The last photo shows one of the Barn Light Electric exterior gooseneck light fixtures above the garage doors. I’ve included it here just because I like the shot!

Saturday, July 24, 2010

The Garage Post

Sam and Harris spent the morning working at PICo drilling mounting holes in the garage post. The post will stand between the third and fourth stalls and support the jib crane we plan to install in the garage at the “L” Shaped House. The photo below shows Sam as he switches to the 9/16” drill bit in the portable magnetic drill press. First we carefully aligned the mounting brackets for the jib crane on the post and used a transfer punch to mark the position of the holes. Finally we precisely locate the drill press above the starter holes and drill through the mounting plates. We delivered the finished post to the house around noon today for Paul to install in the garage.

See the engineering data here

The video shows Harris running the Bux Drill as he completes one of the 9/16” holes in the post.

The last photo shows the finished beam on the floor in the garage. Paul Winters will now stand the post up under the 8” beam in the ceiling and anchor it to the floor.

Monday, July 12, 2010

Painting…Day 63

Oscar finished up painting in the garage early this evening. The photo below shows the back wall of the garage and stairs to the bonus room as he and his crew were applying some finishing touches to the stairs. The grey walls and white ceiling look really nice especially with the stained wood hand rails and trim. Once we add carpeting to the stairs the garage is going to be a showplace!