Matt is back at the “L” Shaped House Saturday morning working on the Mudroom and laying tile in the first floor bath. The photo below shows the mudroom wash-down area with the second step in the process complete…the PVC pan liner is installed on the dry packed base and tested for leaks overnight.
The next photo shows the first floor shower with the very beginnings of the shower wall underway. The 6” square wall tiles look very nice above the 3” tiles on the floor. Matt’s superior workmanship and attention to detail is making this particular bath and shower look absolutely fantastic!
0 comments:
Post a Comment