The last corner lead on the West end is about to go in and the basement foundation walls will follow shortly. The layout for the family room and guest bedroom are easy to see now that the foundation walls have been built. The 8 inch block on the North wall where the egress windows will sit is pretty much at full height.
The tedious work fixing the basement end wall has begun. The first order of business is tearing down the sections that will need to be replaced. The old window on the left will be saw cut and end up flush with the crawl space floor at the 48 inch height.
0 comments:
Post a Comment