Matt and Jim Sletten are finishing up the the three course exposed block wall on the garage perimeter. The first photo shows the garage viewed from the back corner with the entry door and garage door openings visible on the East side and back wall.
The (distorted…) panoramic photo below shows the garage from the East side dirt pile. The four overhead garage door openings are visible along the front wall. Matt figures that they will be done with the garage by the time they go home tonight.
0 comments:
Post a Comment