Saturday, December 12, 2009

Gutters…Day 1 (wrap-up)

The PHC (Protective Home Coverings) guys finished up installing gutters on the front corner of the “L” Shaped House. The first photo shows the Southeast corner with the new gutters running down the outside walls from three roof pitches above.

The next photo shows a close up of the newly installed gutters above the second floor laundry room. The PHC crew is doing a very nice job on the installation. I think they look great!

0 comments: