The Big Sky Construction crew is hard at it installing sheet rock on the first floor of the “L” Shaped House. Their crew expanded back up to 5 guys and the place is buzzing with the sounds of screw guns and routers. The first photo shows the archways leading through the dining room, kitchen, and back hall with drywall installed on all the walls.
The next photo shows the arches at the living room, and dining room entrances from the foyer. At noon today they had just about all the walls on the first floor covered and were mudding in the bonus room as well.
The video captures the fast paced activity pretty well. The house is absolutely filled with particles of sheet rock floating around and lots of noise. We also get (for only the third time) a glimpse of our camera shy site supervisor …Paul Winters…at the very end.
0 comments:
Post a Comment