Friday, January 8, 2010

The “L” Shaped House…200 Days

Today marks day 200 in the construction of the “L” Shaped House. I decided to celebrate this important milestone by posting a couple of photos taken with my “real” camera (Canon 5D). The first shows a front view of the house with the beautiful winter sky in the background.

Winter House 1

The second photo of the dining room and kitchen shows the overall construction progress at the “L” Shaped House nicely. The drywall on the first floor is ready to be primed…finish carpentry will follow shortly.

Sheet Rock 64

In the last two photos I have tried to capture two of the first floor sight lines that show the “open” floor plan and architectural “layering” effect Mike Kloti envisioned during the design process more than a year ago (see Mike’s original thoughts here).

Sheet Rock 66 Sheet Rock 67

OH…Happy 299th posting as well!

0 comments: