Paul Winters has been busy preparing the basement ahead of the drywall installation. The photo below of the West wall of the family room highlights some of these preparations nicely. The corner on the far left had to be sheet rocked prior to the installation of the gas fireplace. Blocking between studs has been added to the wall in the center where the home theatre television will mount and the framing on the right has been modified the accommodate a 12 inch deep built-in media shelf. The Big Sky Construction guys should be following right behind with drywall.
Tuesday, January 26, 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment