The Big Sky Construction guys keep plugging away on the sheetrock at the “L” Shaped House. They have finished up the bonus room and are hard at work hanging drywall in the garage. The first photo shows the East wall of the bonus room with the walls and ceiling finish sanded ready for primer.
The second photo shows the door from the garage at the top of the stairs. Now that the heater in the garage is up and running (and the miniature weather system that occupied the stairwell is gone) the door can finally be opened. The third photo shows the sheet rock going up in the stairwell as the work in the garage continues.
The last photo shows the the end wall of the garage with the chaos that comes with hanging sheet rock all around!
0 comments:
Post a Comment