Curt and his Wire-Rite crew passed the electrical rough in inspection this morning and jumped right into wiring up the service panels. The first photo shows the 125 amp sub-panel on the basement wall that will feed the West end of the house. The second photo shows the 200 amp main panel on the garage wall that feeds the East end.

the next photo is a wider shot of the main service panel in the garage that also shows the work area beneath the stairs. We are installing an abundance of outlets and switches throughout the “L” Shaped House.

The first photo below shows one of the central vacuum outlets installed this morning. Curt and the guys have power wired to the boxes. The folks at Sure Lock in Burnsville will install the PVC piping system and low voltage switches over the next few days. The last photo shows the high tech communication system Curt and I developed to make sure we are all on the same page…