The Electrical, Heating, & Plumbing guys are all moving along nicely. The plumbing inspection is complete and the electrical and heating inspections are scheduled later this week. Most of the photos below contain elements of all three mechanical services. The first shows the water distribution manifold just beyond the meter. The main supply for the house goes straight up. Supplies for the irrigation system, 3 silcocks, and the “hard water” feed to the kitchen are to the left. The next photo shows the upstairs laundry with electrical outlets on the wall, water feed and waste lines in the floor, and the gas line. We are setting the laundry up to accommodate either a gas or electric dryer.
The next photo shows one of the 3 gang electrical switch boxes in the dining room and three PEX water feed lines running to the second floor in the wall.
If you look closely in the last photo you will see switch, ceiling, and outlet boxes in the bonus room. We are also plumbing a gas line to the far end to provide a contingency for a separate heating system in the future.
0 comments:
Post a Comment