Matt Sletten spent most of the day working in the first floor bathroom and is closing in on finishing the shower. The first photo shows the outside wall with ceramic tile reaching all the way to the ceiling. In the second we start to see the details of the tile at the curb. Matt plans to install a sanitary base all around the perimeter of the bathroom using tile cut from the 12” floor tiles used in the hall.