Rick and his crew (Jordan) are hard at work today spraying enamel on the first floor of the “L” Shaped House. I caught Rick just before noon as he was installing a new nozzle in his sprayer. They had already made their way through the entire first floor sanding the trim and cabinets as they prepared for another afternoon of spraying. They plan to have the second coat of white enamel done late today.
I chose to stick around just long enough to catch the beginning of the spraying. The video below shows Rick as he works his way across the back end of the music room on his way toward the open spaces of the living room, foyer, and stairwell. I got out as soon as I started to “taste” paint in my mouth!
0 comments:
Post a Comment