Insulation…Day 2 (evening report)

The Lakewood Insulation guys finished up the insulation and vapor barrier on the second floor and have almost all the batting installed on the first. The photo below shows Anna’s bedroom with the outside wall insulated and the vapor barrier installed. The areas around the windows and the perimeters of the walls are calked and taped. The ceiling will be filled from above with a blown in fiberglass product later.

The next photo shows the insulated exterior walls and vapor barrier in Helen’s room. Here you can see that the interesting attic spaces in the “L” Shaped House will be inside the insulated perimeter of the house.

 

The Lakewood guys have finished most of the first floor. The next photo shows the newly insulated exterior walls in the dining room, kitchen, and breezeway. It is amazing how different the place looks with the nice pink walls.

The last photo shows the inside of the music room. Because of the shed roof above this space gets fiberglass batting all around. It is startling how quiet the interior of this space has become!

0 comments: