Arsenio and the Tappe guys are back today and by noon had worked their way to the very front of the of the “L” Shaped House. The porch and front walls above the standing seam roof both present new challenges for the siding crew. If you look closely in the first photo you can just see the siding and trim wrapping around the ends of the house to the porch. Protecting the nice new standing seam roof as the trim and siding is installed will slow the crew down some on the upper front wall.
The second photo shows the dining room bay window with the beginnings of the MiraTek trim boards installed. Every element of the siding and trim on the front porch has some fussy details associated with it. The Tappe guys will work their way across the front wall and also install the bead board ceiling.