The switch from daylight savings time has thrown off my daily reporting routine. It’s way too dark after 6:00 pm to get any photos of outside progress at the “L” Shaped House so I stopped by this morning and took a few shots of the landscaping completed yesterday. The first photo shows the back side of the house from one of the new dirt piles (actually I think it might better referred to as MUD!). The limestone base and drains are installed in the patio area and much of the grade out to the woods has been roughed in. The JLM guys plan to start on the lower modular wall this morning.
The second photo shows the view from the living room window looking toward the woods behind the house. The limestone base and drains outside the basement door and the rough grading for the walls shows up nicely. The ridge of dirt/mud at the left hand side in the back will be hauled out tomorrow morning by the excavating guys. We will get a much better idea of the grade out back after the extra dirt is gone.