Friday, July 16, 2010

Carpentry…More doors

Paul Winters has spent the last couple of days hanging doors and installing hardware all around the “L” Shaped House. The first photo shows the inside wall of Anna’s room with the door to the hallway and by-pass closet doors installed. With most of the doors on the second floor hung the upstairs is looking a lot like a home!

The next photo shows the second floor hallway leading to the bonus room with the by-pass closet doors installed. The last photo shows the breezeway entry door with the keypad deadbolt and keyed entrance knob.

0 comments: