Monday, June 28, 2010

Ceramic Tile…Day 54

Matt spent the day Friday setting tile in the mudroom and first floor laundry room at the “L” Shaped House. The first photo shows the mudroom shower base with all of the 3” floor tiles in place and the curb finished. He will set the same 12” floor tiles on the walls as he finishes the tile setting in this room.

The next photo shows the “emergency” drain under the first floor washing machine with the 3” floor tiles in place. This drain and the one in the laundry room upstairs both lead into the floor drain in the mechanical room.