Rick and Jordan are back today painting on the “high side” of the “L” Shaped House. The first photo shows Rick near the top of their 40’ ladder cutting-in at the very top of the gable above the basement walk-out patio. They have all of the siding below the “stripe” finished and a first coat on everything but the very highest parts of the exterior.
The next photo shows the same scene from the opposite corner of the back yard. Here we get a sense of how high the above the basement walk-out patio Rick has to climb to paint this gable. As Rick paints on the back wall Jordan is working his way around the house painting the MiraTEC trim. They hope (weather permitting) to have the exterior pretty much wrapped up by the end of this week.
0 comments:
Post a Comment