The Sletten crew continues their work in the basement. The drain tile installation is almost complete and Chuck is nearly done filling and leveling the grade. The three trenches to the right in the photo will become the footings for the main staircase as the cement floor is poured. It looks like they will probably  pour the slab early next week.

The photo below shows the basement from the guest bedroom. We can see the crawl space wall nicely now (thanks to the high tech lighting added by Paul). It is actually starting to feel pretty nice down there!