Thursday, September 24, 2009

Porch Footings…Day 1

The excavating crew also dug the holes for the front, side, and back porch footings. They used an 18” auger on their backhoe to drill the nearly 4’ deep holes and only ran into two giant rocks along the way. Paul Winters & Matt Sletten will set the sonotubes tomorrow and plan to pour concrete Saturday Morning. The first photo shows the 8 holes for footings under the front porch.

The last photo shows the 3 holes for footings under the breezeway porch. The photo in-between shows one of the holes with my foot beside it for scale. If all goes according to plan the Tappe guys should start framing the porches on Monday morning.

0 comments: