The plumbing in the basement floor is in place ready for inspection. The sketch below shows the layout as it is installed (to the best of my ability). We added a floor drain by the water meter and routed the PVC piping a little differently from the previous plan.
The first photo shows a close-up of the connection to the sewer main as it exits the house. The floor drain connection is visible at the left hand side with the pressure tester in place. The second shows the new PVC pipes heading into the Northeast corner of the basement.
0 comments:
Post a Comment