Matt Sletten was back last night working in the basement bathroom. The two photos below show the basement shower after he installed the remaider of the Durock cement board on the walls and built up the dry-packed mortar shower base.
Saturday, May 22, 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment